Toggling cost rollup

Roll up costs and history to a particular parent piece of equipment (assets, positions, and systems only).

To toggle cost rollup:

  1. Open the Assets, Positions, Systems, or Locations form.
  2. Select the equipment for which to toggle cost rollup, and then click the Structure tab.
    Note: If an equipment record has a toggle equipment cost icon next to it, the equipment’s costs do not roll up to the parent equipment. Toggle the cost rollup to modify the equipment record.
  3. Select the parent or child equipment record for which to toggle cost rollup, and then click Toggle Cost Rollup.